RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
Friday, September 18, 2026
RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
Add RCR Wireless as a preferred source on Google
  • Qualcomm 6G Insights
  • Huawei Content Hub
  • Qualcomm – 6G Vision
  • OSS/BSS Channel
  • RCRTech Roundtable: AI Infrastructure
RCR Wireless
RCR Wireless
  • Advanced Mimo
  • Mobile mmWave
  • 5G Positioning
  • Green Networks
  • Metaverse
  • Automotive
  • Industrial and Wide-area IoT
Copyright 2021 - All Right Reserved
Home - Abernathy: FCC should vote on major changes to 800 MHz rebanding plan
Archived ArticlesCarriers

Abernathy: FCC should vote on major changes to 800 MHz rebanding plan

by RCR Wireless News October 4, 2004
written by RCR Wireless News October 4, 2004 Share
LinkedinEmail
Share 0LinkedinEmail
77

WASHINGTON—FCC Commissioner Kathleen Abernathy said the five-member commission should vote again if changes are made to the government’s proposed ruling on solving interference at 800 MHz, thus casting doubt on Nextel Communications Inc.’s hopes to clarify rules through a procedure called an erratum.

Abernathy said she believed the Federal Communications Commission should use a reconsideration motion to address issues being discussed by Nextel and others. That motion would have to be completed before Nextel decides whether it will accept the commission plan. “Erratums are for clerical errors in the item,” Abernathy said at a press briefing last week.

The FCC can reconsider its own rules within 30 days of publication in the Federal Register. If the commission chooses this route, the 30-day clock for Nextel to accept or reject the plan would start over.

Abernathy indicated that many of the issues Nextel has asked to be clarified by erratum would need to be done by an FCC reconsideration motion. Erratums can be done by the FCC’s Wireless Telecommunications Bureau, while a reconsideration motion would require a vote of the full commission. What is less clear is whether the FCC will decide to handle some or all of Nextel’s clarifications by itself or whether it will require Nextel to file a petition for reconsideration. If Nextel is forced to file a petition for reconsideration, other parties critical of the proposal would have an opportunity to weigh in.

Tim Donahue, Nextel chief executive officer, said last month that Nextel believes that the issues it has been discussing with the FCC can be handled through an erratum.

“It is our hope and expectation that the issues can be resolved through an erratum. The people who are in the know have advised me that an erratum will work,” said Donahue. “We haven’t given a whole lot of thought to a petition for reconsideration because we do think and a whole lot of experts have advised us that is the way it will go. If that is not the way, we will have to see where to take it.”

The FCC earlier this year adopted a plan to solve the interference problem, swap some spectrum with Nextel and have Nextel pay to move other companies off the spectrum band Nextel would receive. It has yet to be published in the Federal Register. Once it is published, Nextel has a month to say whether it will accept the plan.

However, the plan likely will be challenged, either by Verizon Wireless or an economic area 800 MHz licensee adversely impacted by the plan.

Some of the issues Nextel has asked to be clarified include the rebanding process, interference protection and the amount of money it could potentially owe the U.S. Treasury at the end of the transition.

“Within the order there are ambiguities and inconsistencies that have to be clarified,” Geoff Stearn, Nextel vice president of spectrum resources, told RCR Wireless News Sept. 24. “Nextel’s past retuning experience has taught us that we have to address these issues upfront. This will prevent delays and misunderstandings during the process. It is critical that we don’t have any misunderstandings.”

Two ESMRs with 800 MHz operations objected to Nextel’s request that the FCC clarify how they would be treated as part of the 800 MHz band reconfiguration. “Nextel has requested `clarification’ that ESMR incumbents, other than Nextel and SouthernLinc, that elect to be relocated out of the non-cellular 800 MHz channel block be retuned first to the 816/817-861/862 MHz block and to the very bottom of the 817/862 MHz band only if there is sufficient guard-band capacity to accommodate them,” said Elizabeth Sachs, outside counsel to Airpeak Communications L.L.C. and Airtel Wireless Services L.L.C. “It is simply not credible that these numerous statements could be read out of the FCC’s order by issuing the `clarification’ sought by Nextel.”

Also last week, Nextel told the FCC that interference requirements set out in the FCC’s 800 MHz rebanding plan can’t be achieved until after the reconfiguration process is complete.

“Commercial mobile radio service carriers cannot meet the new interference protection standards during the reconfiguration transition period during which 800 MHz CMRS, public-safety and private-wireless channels will remain interleaved. The power limits necessary to meet the post-reconfiguration standard in the still-interleaved transition period spectrum environment would typically create significant coverage gaps for Nextel, SouthernLinc and cellular A-band operators,” said Nextel. “CMRS users would experience degraded service, dropped calls and reduced 911-call reliability.”

Nextel proposed that the FCC establish a transition period interference protection standard to “provide an achievable, enforceable interference definition specifying the rights and responsibilities of all 800 MHz licensees.”

Last month, Nextel said it wanted to reduce the amount of money it would owe to the treasury. In a filing regarding meetings Donahue and others had with members of the FCC and staff, Nextel asked that its spectrum valuation be used instead of the FCC’s valuation. Nextel would pay money into the treasury if the value of the spectrum it returns and relocation expenses do not equal $4.86 billion—the value the FCC put on the G-block. The G-block is the highly contested spectrum in the 1.9 GHz band that Nextel would receive as part of the rebanding plan.

The modification of Nextel’s licenses to include spectrum in the G-block is the subject of a legal opinion expected this month by the Government Accountability Office. GAO, the investigative arm of Congress, plans to issue a legal opinion on whether the FCC violated the Miscellaneous Receipts Act or the Anti-Deficiency Act, said Susan Poling, GAO associate general counsel. “It is not an investigation. It is a legal opinion,” said Poling.

Sen. Frank Lautenberg (D-N.J.) asked the GAO to investigate the 800 MHz plan, and the FCC also asked for a legal opinion and it put safeguards in the plan if the ruling was unfavorable.

In June, Verizon Communications Inc., the parent company of Verizon Wireless, warned the FCC that it could be violating criminal laws if it awarded Nextel spectrum in the 1.9 GHz band as part of its plan.

In an apparent attempt to blunt this, the FCC said it would modify Nextel’s 800 MHz licenses instead of granting new licenses. The modification would include use of spectrum in the G-block.

You Might Also Like
  • Regional carriers face tech and spectrum tests to remain competitive, says CCA
  • Verizon identifies uplink, spectrum and standards hurdles on road to 6G
  • New 6G clubs, old 5G duds? (Telco Diary)
  • Telcos, remember your roots! (Telco Diary)
  • Verizon’s big AI deal (telco diary)
  • Killer apps and the 6G pudding test (telco diary)
Share 0 LinkedinEmail
RCR Wireless News

previous post
Nortel, Motorola continue layoffs
next post
Supreme Court to hear tower siting case

White Papers

  • Norton eBook: The 2026 Telco Playbook

  • Enea White Paper: Why Intelligent AAA is the Swiss Army Knife of Telecom

  • CSG White Paper: Telco AI Enabler: Mediation’s Defining Role

  • Enea White Paper: Scalable Database Design for 5G and Beyond

  • Supermicro and NVIDIA Whitepaper: Powering sovereign AI at scale

Editorial Reports

  • Report: Building 6G — Aligning technology, policy and purpose

  • Report: Rethinking the RAN

  • Report: Building AI-Era Network Fabrics

Webinars

  • Appledore Webinar: Closing the Agent-Ready Data Gap for Autonomous Networks

  • Mimosa Webinar – Build the Right Network

  • Webinar: Building 6G — aligning technology, policy and purpose

  • SIMCom Webinar: Scaling your next deployment – from plastic to provisioning

  • Webinar: Rethinking the RAN as AI, cloud and openness converge

Since 1982, RCR Wireless News has been providing wireless and mobile industry news, insights, and analysis to mobile and wireless industry professionals, decision makers, policy makers, analysts and investors.

Facebook Twitter Youtube Linkedin Envelope Rss

Useful Links

  • Subscribe
  • About RCR Wireless News
  • Contact Us
  • Advertise
  • Editorial Calendar
  • Archive
  • RSS
  • Wireless News Archive
  • Subscribe
  • About RCR Wireless News
  • Contact Us
  • Advertise
  • Editorial Calendar
  • Archive
  • RSS
  • Wireless News Archive

Edtior's Picks

Zayo locks in fiber supply as AI infrastructure demand intensifies
IRIS² takes shape as Europe puts €15.6bn satellite plan into orbit
The 4GHz AI case has a way to go (Telco Diary)

Latest Articles

Zayo locks in fiber supply as AI infrastructure demand intensifies
IRIS² takes shape as Europe puts €15.6bn satellite plan into orbit
The 4GHz AI case has a way to go (Telco Diary)
Crown Castle sees spectrum, AI supporting tower growth

© 2026 RCR Wireless News All Right Reserved. Developed by Eight Hats.

Cookie Policy | Privacy Policy

RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
@2020 - All Right Reserved. Designed and Developed by PenciDesign