RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
Sunday, September 6, 2026
RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
Add RCR Wireless as a preferred source on Google
  • Qualcomm 6G Insights
  • Huawei Content Hub
  • Qualcomm – 6G Vision
  • OSS/BSS Channel
  • RCRTech Roundtable: AI Infrastructure
RCR Wireless
RCR Wireless
  • Advanced Mimo
  • Mobile mmWave
  • 5G Positioning
  • Green Networks
  • Metaverse
  • Automotive
  • Industrial and Wide-area IoT
Copyright 2021 - All Right Reserved
Home - Backup power report delay could be good for industry: Cost concerns remain a barrier
CarriersTowersWireless

Backup power report delay could be good for industry: Cost concerns remain a barrier

by RCR Wireless News November 30, 2008
written by RCR Wireless News November 30, 2008 Share
LinkedinEmail
Share 0LinkedinEmail
138

THE BUSH ADMINISTRATION’S DELAY in ruling on backup power reporting requirements mandated by the Federal Communications Commission could suggest it sees merit in mobile phone industry arguments that compliance obligations imposed on carriers and accompanying costs are far greater than what telecom regulators projected.
The Office of Management and Budget was to have wrapped up its review in early November on whether information collection guidelines in the FCC’s backup power decision squares with the Paperwork Reduction Act. The OMB routinely examines rulings from the FCC and other federal agencies to determine whether they adhere to Paperwork Reduction Act objectives, typically approving them after a 60-day review. That hasn’t happened in this case.
An OMB spokesman declined to comment on the delay. It was noted that the OMB reviews sometimes take longer than normal in cases where budget officials need to gather and analyze additional data.

Ruling awaits
The completion of the OMB review – which is not binding on the FCC – would enable a federal appeals court to rule on the central legal question of whether the FCC overstepped its authority in approving the backup power rule. The FCC decision was appealed by cellular industry association CTIA, Sprint Nextel Corp. and paging company USA Mobility Inc.
The U.S. Court of Appeals for the District of Columbia Circuit put the FCC’s backup-power decision on hold in February. In July, following oral arguments in May that did not appear to go well for the commission, the court said it would wait until the OMB acts before issuing a ruling.
In 2007, responding to communications failures caused by Hurricane Katrina and other major storms, the FCC adopted guidelines calling for a minimum 24 hours of emergency backup power for telecom assets inside central offices and eight hours for other facilities such as cell sites, remote switches and digital loop carrier system remote terminals. There are about 200,000 cell sites in the United States, with tower companies operating about 115,000 sites and operators controlling 85,000 sites.
The FCC backup-power rule gives wireless providers six months to determine which assets comply with the new guidelines and to ascertain which facilities are exempted for safety reasons. Carriers with wireless facilities covered by the new rule, but not in compliance, must rectify the situation or file an action plan within 12 months on how they intend to meet new federal requirements.

Heated debate
The agency’s action followed the issuance of recommendations in 2006 by the Independent Panel Reviewing the Impact of Hurricane Katrina on Communications Networks. The wireless industry claims the backup power rule veers from the panel’s report. The FCC initially responded to protests by partially modifying the rule and extending auditing and compliance deadlines.
The FCC estimated each wireless carrier would have to shell out approximately $312,600 to comply with backup-power information collection requirements, but the mobile phone and tower industries told the OMB that figure doesn’t even come close to the cost of the federal mandate. Moreover, wireless providers and the tower sector argue the backup power rule’s burdensome requirements will have the unintended effect of draining resources needed to quickly restore communications to consumers and first responders when facilities are damaged in natural disasters.
PCIA, an industry association representing top tower companies, called the FCC backup power reporting requirements “totally erroneous and unrealistic.”

You Might Also Like
  • India weighs rip-and-replace of legacy Chinese telecoms equipment
  • VodafoneThree intros tiered 5G SA slicing portfolio for consumers, enterprises, critical services
  • Indosat, Nvidia launch AI center as telco expands AI infra
  • Telstra targets AI-driven growth with 5G, digital infrastructure push
  • Rakuten confirms KDDI roaming will be reduced as own network expands
  • KDDI expands AI, cloud, and data center investment
Share 0 LinkedinEmail
RCR Wireless News

previous post
iPhone App Store Reaches 10K Apps
next post
Fuel cells poised to become next portable power source

White Papers

  • Norton eBook: The 2026 Telco Playbook

  • Enea White Paper: Why Intelligent AAA is the Swiss Army Knife of Telecom

  • CSG White Paper: Telco AI Enabler: Mediation’s Defining Role

  • Enea White Paper: Scalable Database Design for 5G and Beyond

  • Supermicro and NVIDIA Whitepaper: Powering sovereign AI at scale

Editorial Reports

  • Report: Rethinking the RAN

  • Report: Building AI-Era Network Fabrics

  • Quantum Safe Networks Market Pulse Report

Webinars

  • Appledore Webinar: Closing the Agent-Ready Data Gap for Autonomous Networks

  • Mimosa Webinar – Build the Right Network

  • Webinar: Building 6G — aligning technology, policy and purpose

  • SIMCom Webinar: Scaling your next deployment – from plastic to provisioning

  • Webinar: Rethinking the RAN as AI, cloud and openness converge

Since 1982, RCR Wireless News has been providing wireless and mobile industry news, insights, and analysis to mobile and wireless industry professionals, decision makers, policy makers, analysts and investors.

Facebook Twitter Youtube Linkedin Envelope Rss

Useful Links

  • Subscribe
  • About RCR Wireless News
  • Contact Us
  • Advertise
  • Editorial Calendar
  • Archive
  • RSS
  • Wireless News Archive
  • Subscribe
  • About RCR Wireless News
  • Contact Us
  • Advertise
  • Editorial Calendar
  • Archive
  • RSS
  • Wireless News Archive

Edtior's Picks

Microsoft and AWS launch a managed multicloud interconnect
Private 5G docks in Hamburg – as Deutsche Telekom and Ericsson scratch a...
India weighs rip-and-replace of legacy Chinese telecoms equipment

Latest Articles

Microsoft and AWS launch a managed multicloud interconnect
Private 5G docks in Hamburg – as Deutsche Telekom and Ericsson scratch a seven-year itch
India weighs rip-and-replace of legacy Chinese telecoms equipment
SK Telecom’s Topdda turns work vans into an AI inspection fleet

© 2026 RCR Wireless News All Right Reserved. Developed by Eight Hats.

Cookie Policy | Privacy Policy

RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
RCR Wireless
  • News
  • Channels
    • 5G
    • 6G
    • BSS OSS
    • Carriers
    • IoT
    • Network Infrastructure
    • Open RAN
    • Private 5G
    • Telco AI
    • Telco Cloud
    • Test & Measurement
  • Resources
    • Reports
    • Webinars
    • White papers
    • AI Fundamentals
    • Analyst Angle
    • Editorial Calendar
    • Fundamentals
      • 5G NR Release 17
      • AI
        • Telco AI in 2025
    • Podcasts
      • Let’s Get Digital with Carrie Charles
      • Wireless Connectivity to Enable Industry 4.0 for the Middleprise
      • Well Technically…
      • Will 5G Change the World
      • Accelerating Industry 4.0 Digitalization
  • AI Infrastructure
  • Programs
  • Events
  • RCRtv
  • Advertise
  • Subscribe
@2020 - All Right Reserved. Designed and Developed by PenciDesign